Free tool · India payroll

Plan a mid-year payroll switch

Pick what you run payroll on today and the month you want to move. You get a dated plan and a checklist: what to export, the opening balances to load, the parallel run and Form 16 for the full year.

Your switch

Inputs

Enter your details to see an estimate. It is calculated in your browser; nothing is sent anywhere.

Example: an HR and payroll suite, going live in October 2026

Go live in October 2026

October starts a quarter, so each quarter’s TDS return for 2026–27 comes from one system.

  1. From August 2026

    Decide the cut-over and freeze changes

    Agree October 2026 as the first month run in the new system. Freeze salary-structure changes for the last month in the old one, and name one person who owns the switch.

  2. During September 2026

    Export and import your people data

    Export employee, salary structure and year-to-date reports from your current tool as CSV or Excel. No column layout for another vendor’s export is verified yet, so plan time to match its columns to the import template. Then import employees, bank details and salary structures with every row validated, and fix rejected rows at the source. Beta
  3. After the September 2026 payroll is final

    Load year-to-date opening balances

    Load each employee’s year-to-date pay, TDS and statutory figures up to the end of September 2026 as opening balances, so the year continues where it left off. Beta
  4. October 2026

    Run a month in parallel

    Run October 2026 payroll in both systems and compare them line by line. Explain every difference before you finalise, and only then switch the old payroll off. Beta
  5. After March 2027

    Issue Form 16 for the whole year

    Form 16 for 2026–27 carries the full year, including the 6 months run before the switch. Keep read access to the old system until it is issued. Unverified

Checklist

What to export

  • Employee master: name, PAN, UAN, ESI number, date of joining, location, bank account and IFSC
  • Salary structures and each employee’s current components
  • CSV or Excel exports from your current tool, with its columns matched to the import template
  • Leave balances as of the cut-over date
  • Open loans, advances and their recovery schedules
  • Investment declarations and proofs submitted this year
  • Pending arrears, revisions and full and final settlements

Opening balances (to the end of September 2026)

  • Year-to-date gross pay and each taxable component
  • Year-to-date TDS deducted
  • Year-to-date PF, ESI, Professional Tax and LWF
  • Previous-employer income declared by mid-year joiners
  • Totals checked against the old system’s registers before loading

Parallel run (October 2026)

  • Same inputs in both systems: attendance, loss of pay, new joiners and leavers
  • Net pay compared employee by employee
  • TDS, PF, ESI and PT compared employee by employee
  • Every difference explained and signed off before finalising
  • Old payroll switched off only after sign-off

Year-end and Form 16

  • TDS returns: each quarter from one system
  • Form 16 for 2026–27 checked against the full year’s TDS
  • Read access to the old system kept until Form 16 is issued
Download the checklist

The download is the example plan above. Change the inputs to download your own.

How the plan is built

An Indian payroll year runs from April to March. Moving in the middle of it means the new system must know what the old one already paid and deducted, or the tax for the rest of the year comes out wrong. So the plan works back from your first month in the new system:

  • Two months before, agree the date, freeze structure changes and name an owner.
  • The month before, export and import employees, bank details and salary structures, fixing rejected rows at the source.
  • Once the last old payroll is final, load opening balances: year-to-date pay, TDS and statutory figures per employee.
  • In the first month, run payroll in both systems (a parallel run) and explain every difference before you finalise.
  • After March, Form 16 carries the whole year, including the months before the switch.

The planner also checks the quarter: TDS returns (Form 24Q) are quarterly, so a mid-quarter switch means one return draws on two systems.

In Montr HI

What the plan relies on

Each step that uses the product names one capability from our claims register, with its real status.

  • Import with every row checked

    Bulk import and export with row-by-row validation.

    Beta
  • Opening balances and a parallel run

    Switch payroll mid-year with opening balances, a parallel run and Form 16 continuity.

    Beta
  • Form 16 for the full year

    Generates Form 16 in bulk.

    Unverified

Pre-launch Montr HI is pre-launch. Everything described here is built and tested; none of it is proven with customers yet.

Questions about switching payroll

Which month is best for switching payroll?

April is simplest: there are no year-to-date balances to carry. After that, the first month of a quarter (July, October or January) keeps each quarterly TDS return in one system. Any month can work if the opening balances are right.

What is a parallel run and is it worth it?

You run the first month in both the old and the new system with the same inputs, then compare net pay, TDS and statutory contributions employee by employee. It costs a month of double work and catches mapping mistakes before anyone is paid wrongly.

Will Form 16 cover the months run in the old system?

That is what the opening balances are for: year-to-date pay and TDS from the old system are loaded so Form 16 can carry the full year. Keep read access to the old system until Form 16 is issued, and check the totals against its registers.

Do you have ready-made layouts for other vendors’ exports?

Not verified ones. Plan time to match your export’s columns to the import template; the import then checks every row and shows what will be created before anything is saved.

Comparing HR systems?

See the switch plan on your data

See the import and a parallel run on a walkthrough, or try Montr HI in the 14-day sandbox, where nothing is sent, paid or filed.