Payroll switch plan: go live in October 2026 (FY 2026–27) Moving from: An HR and payroll suite October starts a quarter, so each quarter’s TDS return for 2026–27 comes from one system. PLAN 1. From August 2026: Decide the cut-over and freeze changes Agree October 2026 as the first month run in the new system. Freeze salary-structure changes for the last month in the old one, and name one person who owns the switch. 2. During September 2026: Export and import your people data [Beta] Export employee, salary structure and year-to-date reports from your current tool as CSV or Excel. No column layout for another vendor’s export is verified yet, so plan time to match its columns to the import template. Then import employees, bank details and salary structures with every row validated, and fix rejected rows at the source. 3. After the September 2026 payroll is final: Load year-to-date opening balances [Beta] Load each employee’s year-to-date pay, TDS and statutory figures up to the end of September 2026 as opening balances, so the year continues where it left off. 4. October 2026: Run a month in parallel [Beta] Run October 2026 payroll in both systems and compare them line by line. Explain every difference before you finalise, and only then switch the old payroll off. 5. After March 2027: Issue Form 16 for the whole year [Unverified] Form 16 for 2026–27 carries the full year, including the 6 months run before the switch. Keep read access to the old system until it is issued. WHAT TO EXPORT [ ] Employee master: name, PAN, UAN, ESI number, date of joining, location, bank account and IFSC [ ] Salary structures and each employee’s current components [ ] CSV or Excel exports from your current tool, with its columns matched to the import template [ ] Leave balances as of the cut-over date [ ] Open loans, advances and their recovery schedules [ ] Investment declarations and proofs submitted this year [ ] Pending arrears, revisions and full and final settlements OPENING BALANCES (TO THE END OF SEPTEMBER 2026) [ ] Year-to-date gross pay and each taxable component [ ] Year-to-date TDS deducted [ ] Year-to-date PF, ESI, Professional Tax and LWF [ ] Previous-employer income declared by mid-year joiners [ ] Totals checked against the old system’s registers before loading PARALLEL RUN (OCTOBER 2026) [ ] Same inputs in both systems: attendance, loss of pay, new joiners and leavers [ ] Net pay compared employee by employee [ ] TDS, PF, ESI and PT compared employee by employee [ ] Every difference explained and signed off before finalising [ ] Old payroll switched off only after sign-off YEAR-END AND FORM 16 [ ] TDS returns: each quarter from one system [ ] Form 16 for 2026–27 checked against the full year’s TDS [ ] Read access to the old system kept until Form 16 is issued Montr HI is pre-launch: built and tested, with no customers in production yet. Statuses in brackets are from its claims register. This plan is general guidance, not tax advice. Check figures with your payroll adviser.